Part 4: Calibrate the Generation Fleet

Note

This tutorial assumes you have completed Part 1 through Part 3. Demand should already be calibrated (load_options.scale: 1.005) and config.KZ.yaml should include the Part 3 settings.

Introduction

In Part 2 the installed capacity table showed a large gap for solar and wind: the model reported ~20 GW solar and ~6 GW wind against ~1 GW each in 2020 statistics. Coal and gas were closer to the national report by KEGOC, but still imperfect.

PyPSA-Earth loads the existing fleet from powerplantmatching, the same global database Part 2 already reflected for coal and gas. Solar and wind farms are in there too. What inflated the baseline was not missing data, but default settings that add IRENA capacity on top and allow the optimiser to build more (IRENA year 2023, renewables in extendable_carriers).

In this tutorial we lock the model to the 2020 fleet:

  1. See how Snakemake builds the plant list and inspect it.
  2. Filter plants to units operating in 2020 (powerplants_filter).
  3. Turn off new build and set IRENA totals for 2020 (extendable_carriers, estimate_renewable_capacities).
  4. Optionally replace powerplantmatching with a custom plant list where the global database is incomplete (often gas and smaller thermal units).

After re-running, compare installed capacity against the same Part 2 validation tables. With no extendable carriers, p_nom and p_nom_opt should match, unlike the Part 2 baseline, where optimal capacity (~20 GW solar, ~6 GW wind) was far above installed (~1–2 GW each).

Part 2 vs Part 4

Part 2's validation table used p_nom_opt, which counted new build on top of existing solar and wind. Those already had p_nom ~1–2 GW from powerplantmatching and IRENA top-up, not zero. However, defaults also marked them extendable, so the optimiser added much more. After locking the fleet here, installed and optimal capacity should match.

This series stays in the electricity workflow (solve_all_networks). All settings below live under electricity in the config.


Where generation enters the workflow

Generation is assembled in two Snakemake rules, both before the network is simplified or solved. build_powerplants pulls data from powerplantmatching (and optionally your own CSV), then writes one row per plant to disk:

build_powerplants  →  resources/KZ/powerplants.csv   ← one row per plant
add_electricity    →  networks/KZ/elec.nc
… simplify, cluster, prepare, solve …
Rule What it does
build_powerplants Pulls powerplantmatching data for your countries, applies powerplants_filter, optionally merge or replace with data/custom_powerplants.csvpowerplants.csv
add_electricity Reads powerplants.csv, attaches demand and generators → networks/KZ/elec.nc

Step 1: Inspect the plant list

The rule build_powerplants writes resources/KZ/powerplants.csv, one row per plant. A few lines from a Part 1 run (columns trimmed for readability):

Name,Fueltype,Technology,Capacity,DateIn,DateOut,Country
Ekibastuz,Hard Coal,Steam Turbine,4000,1980,2025,KZ
Shulbi,Hydro,Reservoir,702,1987,2087,KZ
Almaty,CCGT,CCGT,120,2017,2057,KZ
Zhangiz Tobe Solar Farm,Solar,PV,30,2019,2044,KZ
Aktogay Wind Farm,Wind,Onshore,150,2022,2047,KZ
Taraz Dzhambul Kazakhstan,Oil,Steam Turbine,185,1996,2036,KZ

The full file has more columns (lat, lon, bus, …) and on the order of 100 rows for Kazakhstan. Totals by fuel type (GW):

Fueltype GW
Hard Coal 11.72
CCGT 2.43
Hydro 3.12
Solar 1.27
Wind 1.21
Oil 1.14

Solar and wind are already listed, not only conventional plants. Your file should look similar after Part 1 simulation; open resources/KZ/powerplants.csv locally if you want the complete list.

Compare with the 2020 installed capacity table in Part 2. Coal and hydro are roughly the right order of magnitude; gas is often under-represented in global databases. The Part 2 model solar/wind totals were much higher than KEGOC because of IRENA gap-fill and extendable build, not because powerplantmatching had no renewables.


Step 2: Understand the defaults we are changing

PyPSA-Earth defaults in config.default.yaml target a forward-looking model (plants active around 2023, room for new build). For 2020 validation we override three keys:

Config key Default Part 4 (2020 validation) Effect
electricity.powerplants_filter plants active in 2022–2023 plants operating in 2020 Filters every row in powerplants.csv at build time
electricity.extendable_carriers.Generator [solar, onwind, offwind-ac, offwind-dc, OCGT] [] No new solar, wind, or gas build
electricity.estimate_renewable_capacities.year 2023 2020 IRENA solar/wind totals match the validation year

An empty Generator list under extendable_carriers locks the 2020 fleet: the optimiser cannot add new solar, onwind, or OCGT beyond what is already in powerplants.csv and IRENA gap-fill.


Step 3: Filter plants for 2020

powerplants_filter is a pandas.query expression applied in build_powerplants after loading powerplantmatching data. It runs on all fuel types: coal, gas, hydro, solar, and wind.

Keep plants that were operating in 2020:

  • DateIn <= 2020 — commissioned on or before 2020 (or unknown commission date).
  • DateOut >= 2020 — still operating in 2020 (or unknown decommission date).

The DateOut != DateOut / DateIn != DateIn clauses treat missing dates (NaN) as unknown, and those plants are kept.

Add to config.KZ.yaml:

electricity:
  powerplants_filter: (DateOut >= 2020 or DateOut != DateOut) and (DateIn <= 2020 or DateIn != DateIn)

Tip

After you add this filter and re-run (Step 6), open logs/KZ/build_powerplants.log. It shows how many plants survived the filter. Confirm rows were dropped as expected.


Step 4: Lock renewable capacities

Two settings work together: stop the optimiser from expanding, and pin solar/wind to IRENA 2020 totals.

4a. Remove carriers from extendable_carriers

Default includes solar, wind, and OCGT. For a fixed 2020 fleet, leave empty lists:

electricity:
  extendable_carriers:
    Generator: []
    StorageUnit: []
    Store: []
    Link: []

4b. Point IRENA stats at 2020

PyPSA-Earth sums existing solar and wind from powerplants.csv, then fills any national shortfall to match IRENA using estimate_renewable_capacities:

electricity:
  estimate_renewable_capacities:
    stats: irena
    year: 2020
  • stats: irena top up solar and wind to IRENASTAT national installed capacity.
  • year: 2020 match the validation year.

Step 5: Complete your config

Merge the generation settings with your Part 3 demand block (load_options, enable.retrieve_cutout: false, etc.):

# SPDX-FileCopyrightText:  PyPSA-Earth and PyPSA-Eur Authors
#
# SPDX-License-Identifier: CC0-1.0

countries: ["KZ"]

run:
  name: "KZ"
  shared_cutouts: false

enable:
  retrieve_databundle: false
  retrieve_cutout: false

scenario:
  opts: [6h]

load_options:
  source: gegis
  weather_year: 2013
  prediction_year: 2030
  scale: 1.005

electricity:
  powerplants_filter: (DateOut >= 2020 or DateOut != DateOut) and (DateIn <= 2020 or DateIn != DateIn)
  extendable_carriers:
    Generator: []
    StorageUnit: []
    Store: []
    Link: []
  estimate_renewable_capacities:
    stats: irena
    year: 2020

solving:
  solver:
    name: highs

Or download the snippet.

Your file should contain both load_options (Part 3) and electricity (Part 4). Snakemake merges this file on top of config.default.yaml, you only need the keys you are overriding.


Step 6: Re-run the workflow

Generation settings affect build_powerplants and add_electricity and everything downstream:

snakemake --cores 4 solve_all_networks --configfile config.KZ.yaml

Snakemake rebuilds powerplants.csv, re-runs add_electricity, and re-solves. Expect a similar runtime to Part 3 (~7–10 minutes with cached cutouts).


Step 7: Verify installed capacity

Reopen the notebook from Part 2 and reload the solved network. Use the same statistics() call as in Part 2 with a locked fleet, Installed and Optimal capacity should match for generators:

import pypsa

n = pypsa.Network("results/KZ/networks/elec_s_10_ec_lcopt_6h.nc")

caps = n.statistics()["Installed Capacity"].dropna() / 1e3  # GW
caps = caps.drop(["Line", "Load"], errors="ignore")  # dropping line and load values
print(caps.sort_values(ascending=False).to_string())

After Part 4 you should see something like (all values in GW from the / 1e3 above):

Generator    Load shedding         17.70
             Coal                  11.60
             Combined-Cycle Gas     2.47
StorageUnit  Reservoir & Dam        2.34
Generator    Oil                    1.14
             Solar                  0.91
             Onshore Wind           0.43
             Run of River           0.13

Ignore Load shedding and AC line capacity as they are not part of the generation fleet. Solar (~0.9 GW) and onshore wind (~0.4 GW) should now sit near KEGOC/IRENA 2020 levels, not the ~20 / ~6 GW from the Part 2 baseline.

Comparison vs. KEGOC 2020 (GW):

Carrier KEGOC 2020 Baseline (Part 2) After Part 4
Coal 13.41 11.72 11.60
Gas 6.01 2.43 2.47
Hydro 2.95 2.46 2.46
Solar 0.96 20.06 0.91
Wind 0.51 6.19 0.43

Solar and wind capacities are now aligned with statistics while that was the main gap previously. Coal and gas installed capacity are still below KEGOC; powerplantmatching under-reports gas in particular. The Advanced section below uses the custom fleet to replace powerplantmatching (or merge extra plants).

Generation mix (still approximate)

Locking capacities does not fix dispatch. An optional check is to use same statistics() call, Supply column in TWh:

supply = n.statistics()["Supply"].dropna() / 1e6  # TWh
supply = supply.drop(["Line", "Load"], errors="ignore")  # dropping line and load values
print(supply.sort_values(ascending=False).to_string())

After Part 4 you might see (in TWh):

Generator    Coal                   90.85
             Load shedding           7.99
StorageUnit  Reservoir & Dam         2.83
Generator    Combined-Cycle Gas      2.40
             Onshore Wind            1.28
             Solar                   1.16
             Run of River            0.78
             Oil                     0.00

Solar (~1.2 TWh) and wind (~1.3 TWh) are now in the right ballpark vs KEGOC 2020 generation (~1.3 / ~1.1 TWh). Coal (~91 TWh) is too high and gas (~2.4 TWh) too low: the model still lacks gas capacity and over-relies on coal. Hydro (~3.6 TWh) remains under-generated. Non-zero load shedding (~8 TWh) means the solve still struggles to meet demand in some hours.

Improving the generation table in Part 2 is a follow-up step (custom plants, hydro inflow, marginal costs, and so on).


Advanced: Custom powerplants

Step 7 left gas short: ~2.5 GW CCGT installed and ~2.4 TWh annual generation vs ~6 GW gas in KEGOC's 2020 statistics, and almost no OCGT peakers in powerplantmatching. For Kazakhstan, the global database misses many industrial gas turbines and smaller thermal units that show up in national statistics.

This tutorial ships an adapted copy of custom_powerplants.csv from the pypsa-kz-data repository and contains 120 rows in powerplantmatching format as a full Kazakhstan fleet instead of patching gaps by hand.

Enable custom powerplants

PyPSA-Earth reads data/custom_powerplants.csv in build_powerplants. By default it is ignored. Add to config.KZ.yaml (alongside the Part 4 electricity block):

electricity:
  custom_powerplants: replace   # "false" | "merge" | "replace"
Value Behaviour
false powerplantmatching only (Steps 1–7), the CSV is ignored
merge Append custom rows to powerplantmatching
replace Use only your CSV, recommended for the fleet below

What is in the file

Download the file and save it as data/custom_powerplants.csv, replacing the existing placeholder.

Installed capacity in the custom list (MW):

Fueltype MW
Hard Coal 13,171
CCGT 3,580
Hydro 2,688
OCGT 1,626
Solar 822
Wind 649

The main gain over powerplantmatching is OCGT (~1.6 GW) and fuller CCGT coverage. With replace, this list is the sole plant source. So, no double-counting happens against overlapping powerplantmatching rows.

Example rows (industrial peakers absent from powerplantmatching):

Name,Fueltype,Technology,Set,Country,Capacity,DateIn,DateOut,lat,lon
ES AFP TNK Kazchrome,OCGT,OCGT,PP,KZ,135,1996,2146,50.34808,57.13376
ZHGTS 56 JSC CNPC-Aktobe,OCGT,OCGT,PP,KZ,118,1999,2149,48.385282,57.434115
Aktobe CHP,CCGT,CCGT,CHP,KZ,88,1962,2112,50.33618,57.14072

The same powerplants_filter from Step 3 still applies which leads to plants with DateIn > 2020 are dropped.

Re-run and verify

snakemake --cores 4 solve_all_networks --configfile config.KZ.yaml

Snakemake rebuilds build_powerplants when custom_powerplants or the CSV changes. Re-check installed capacity (Step 7): CCGT and OCGT should move toward KEGOC 2020, and annual Combined-Cycle Gas / Open-Cycle Gas supply should rise relative to the coal-heavy mix from Step 7.

After replace, installed capacity (GW) tracks KEGOC 2020 much more closely:

Line         AC                    31.81
Generator    Load shedding         17.70
             Coal                  13.17
             Combined-Cycle Gas     3.58
StorageUnit  Reservoir & Dam        2.31
Generator    Open-Cycle Gas         1.60
             Solar                  0.80
             Onshore Wind           0.46

CCGT (~3.6 GW) and OCGT (~1.6 GW) together reach ~5.2 GW which is near KEGOC ~6 GW gas. Coal (~13.2 GW) matches KEGOC ~13.4 GW. Hydro (~2.7 GW) is modeled as reservoir only (no run-of-river rows in the custom list).

Annual Supply (TWh) is still far from KEGOC 2020:

Generator    Coal                   89.47
             Load shedding           7.72
StorageUnit  Reservoir & Dam         7.15
Generator    Onshore Wind            1.34
             Solar                   0.99
             Combined-Cycle Gas      0.63
             Open-Cycle Gas          0.00

Solar (~1.0 TWh) and wind (~1.3 TWh) look reasonable vs KEGOC (~1.3 / ~1.1 TWh). Coal (~89 TWh) is far too high and gas (~0.6 TWh from CCGT; OCGT idle) far too low vs KEGOC (~75 / ~22 TWh). Hydro (~7.1 TWh from reservoirs) is closer to KEGOC (~9.5 TWh) than the Step 7 mix, but still under-generated.

Load shedding (~7.7 TWh) is still high and roughly unchanged from Step 7 even after capacity improves. Several factors may contribute, alone or together:

  • Network topology: a bus may be poorly connected (missing line or no path from local generation to load).
  • Transmission limits: line capacities may block power from reaching demand in some hours or regions.
  • Spatial mismatch: demand and generation may be on different 10-cluster buses; national totals can look fine while some regions are short.
  • Dispatch economics: cheap coal is used first; gas, hydro, and renewables may not fill remaining gaps.

Capacity alignment does not automatically fix the generation mix either. The optimiser still dispatches the cheapest available energy. With default settings that often means:

  • No CO₂ or fuel constraints: nothing pushes the model away from cheap coal.
  • Marginal costs: coal is typically cheaper than gas in the default cost tables, so CCGT/OCGT sit idle even when capacity is there.
  • Spatial resolution: how load and plants are distributed across clusters may not match real geography.
  • Transmission: line limits may be loose enough that northern coal serves most of the country, or tight enough to cause regional shortfalls.

Comparison vs. KEGOC 2020 (TWh):

Carrier KEGOC 2020 Baseline (Part 2) After custom_powerplants
Coal 74.50 62.54 89.47
Gas 21.69 0.63 0.63
Hydro 9.55 3.61 7.15
Solar 1.25 25.40 0.99
Wind 1.09 14.81 1.34

Solar and wind generation move close to KEGOC; coal stays too high and gas too low. The capacity match is better, but dispatch is not yet calibrated.


Recap

Step Config key Role
3 electricity.powerplants_filter Keep plants operating in 2020
4a electricity.extendable_carriers Empty Generator means no new solar/wind/gas build
4b electricity.estimate_renewable_capacities IRENA 2020 solar/wind totals
Adv. electricity.custom_powerplants: replace Use data/custom_powerplants.csv as the full fleet

Demand is calibrated (Part 3); the 2020 generation fleet is now locked for capacity comparisons. In a follow-up tutorial we can tune dispatch and generation statistics against the Part 2 electricity generation (2020) table.